Electro Mechanical
- Nagarjuna Sagar Pumped Storage Scheme Stage II (1 x 100 MW)
- Upper Kolab HEP (4 x 80 MW)
- Burla Power House (1 x 37.5 MW)
- Servalar HEP (1 x 20 MW)
- Kundah Power House V (1 x 21.6 MW)
- Lower Mettur HEP (4 x 15 MW)
- Lower Bhavani Dam (5 x 2 MW)
- Shivapur Hydro Electric Power Station (2 x 9 MW)
- Ghataprabha Dam Power House (2 x 16 MW)
- Mani Dam Power House (2 x 4.5 MW)
- Eastern Gandak Canal HEP (3 x 5 MW)
- Rammam HEP (4 x 12.75 MW)
- Lower Periyar HEP (3 x 60 MW)
- Kodasalli Dam Power House (3 x 40 MW)
- Narayanapur Power House (2 x 5.8 MW)
- Teesta Canal Hydel Project (3 x 7.5 MW)
- Doyang HEP (3 x 25 MW)
- Upper Indravathi HEP (4 x 150 MW)
- Gerusoppa Dam Power House (4 x 60 MW)
- Ranganadi HEP (3 x 135 MW)
- Bansagar HEP (2 x 15 MW)
- Srisailam Left Bank HEP(6 x 153 MW)
- Kopili HEP (1 x 25 MW)
- Pykara HEP (3 x 50 MW)
- Sardar Sarovar River Bed Project (6 x 204 MW)
- Tala HEP (6 x 170 MW)
- Balimela HEP (2 x 75 MW)
- Teesta V HEP (3 x 170 MW)
- Baglihar Stage I HEP (3 x 150 MW)
- Middle Marshangdi HEP (2 x 39 MW)
- Varahi Underground Power House (2 x 115 MW)
- Teesta Low Dam HEP (4 x 33 MW)
- Myntdu Leshka HWP (3 x 42 MW)
- Chuzachen HEP (2 x 55 MW)
- Sorang HEP (2 x 50 MW)
- Baglihar Stage II HEP (3 x 150 MW)
- Lower Jurala HEP (6 x 40 MW)