Hydro Mechanical

Penstocks / Steel Liners:

  • Bansagar Dam (2 x 15 MW)
  • Tons Hydel Project (3 x 105 MW)
  • Upper Sileru HE Scheme (2 x 60 MW)
  • Kalinadi HEP (Kadra Dam (3 x 50 MW) + Kodasalli Dam (3 x 40 MW)
  • Doyang HEP (3 x 25 MW)
  • Gerusoppa Dam Power House (4 x 60 MW)
  • Srisailam Left Bank Power Station (6 x 153 MW)
  • Ranganadi HEP (3 x 135 MW)
  • Pykara HEP (3 x 50 MW)
  • Khopoli Power House (3 x 24 MW)
  • Dhauliganga HEP (4 x 70 MW)
  • Ghatghar Pumped Storage Scheme HEP (2 x 125 MW)
  • Tehri Hydro Power Project (4 x 250 MW)
  • Balimela HEP (2 x 75 MW)
  • Maneribhali HEP (4 x 76 MW)
  • Patikari HEP (2 x 8 MW)
  • Koldam HEP (4 x 200 MW)
  • Koteshwar HEP (4 x 100 MW)
  • Malana HEP (2 x 50 MW)
  • Myntdu Leshka HEP (3 x 45 MW)
  • Budhil HEP (2 x 35 MW)
  • Parbati HEP (2 x 400 MW)
  • Uhl HEP (3 x 33.33 MW)
  • Chuzachen HEP (2 x 49.5 MW)
  • Sawra Kuddu HEP (3x 37 MW)
  • Sorang HEP (3 x 50 MW)
  • Rampur HEP (6 x 68.666 MW)
  • Kashang HEP (6 x 35 MW)
  • Teesta – III HEP (6 x 200 MW)

Gates:

  • Tehri Project (4 x 250 MW)
  • KKNPP (2 x 1000 MW)
  • Balimela HEP (2 x 75 MW)
  • Uri HEP (4 x 60 MW)
  • GLIS – I (Lift Irrigation Project)
  • Patikari HEP (2 x 8 MW)
  • Budhil HEP (2 x 35 MW)
  • GLIS – II
  • Koteshwar HEP (4 x 100 MW)
  • Koldam HEP (4 x 200 MW)
  • Tehri HPP (4 x 100 MW)
  • Sainj HEP (2 x 2.5 MW)
  • Chutak HEP (4 x 11 MW)
  • Bhupathipalam Reservoir Project
  • Nimoo Bazgo HEP (3 x 15 MW)
  • Teesta stage VI HEP (4 x 125 MW)
  • Chuzachen HEP (2 x 49.5 MW)
  • Sorang HEP (2 x 50 MW)
  • Nagarjunasagar Tailpond Dam Project (2 x 25 MW)
  • Teesta – III HEP (6 x 200 MW)