Approved Vendor for Steel Bridge Girders

InformationDetails
Ownership — Board of Directors / Partners
  • Vasudeva Prasad Ravi
  • Suresh Ravi
  • V V Krishna Rao
  • Radha Kumari Ravi
Incorporation Details Incorporated under the Companies Act on 1st June 1982.
Registered Address PES Engineers Private Limited
6-3-1218/6/2, Umanagar,
Begumpet,
Hyderabad – 500 016,
Telangana
Phone: +91-44756756 / 44756750
E-mail: contracts@peseng.net
InformationDetails
Works Address PES Engineers Private Limited
Plot No. A-10, ELDECO-SIDCUL Industrial Park Limited,
Sitarganj – 262 405, Dist. U.S. Nagar (Uttarakhand)
Phone: +91 94404 04759 (R V Naidu), +91 97196 66789
E-mail: sitarganj@peseng.net
Facilities — Machinery & Plants
  • Total plant area: 26,700 Sq.mtr
  • Fabrication Shop:
    • Fabrication, Bending, Welding, Straightening, Machine shop — Shed No. 1: 53.3M × 48M × 14M
    • CNC Cutting Shop — Shed No. 2: 30M × 10M × 9M
    • CNC Drilling Shop — Shed No. 3: 25M × 10M × 9M
    • Drilling Area — Shed No. 4: 30M × 7.2M × 9M
    • Welding Area — Shed No. 5: 18M × 7M
  • Blasting Shop — Shed No. 6 (closed chamber): 22M × 12.8M × 9M
  • Metalizing & Painting Shop: 20M × 18M
  • Assembly Area — Open Platform No. 1: 72M × 20.2M; Platform No. 2: 62.5M × 14.5M
  • Stacking Area: open area
Details of RDSO Approval RDSO letter No.: CBS/G/Reg/PES, dt. 11-10-2019
Item name: Steel Bridge Girder
Annual production capacity: 9,000 MT
Last quality audit: 17-04-2023
Next quality audit due: to be updated
Works Registration Details GST Registration Certificate No.: 05AABCP4220B1Z8
GST Registration Date: 01-07-2017
Factory License Details Registration No.: USN-1358
Date of registration: 06th April 2009
Valid up to: 31st December 2026
ISO 9001 Certification
  • Certifying body: Bureau of Indian Standards
  • Date of certification: 21-11-2025
  • Last surveillance audit: 16-10-2025
  • Last internal audit (with compliances): 23-04-2026
Organisation Chart Qualifications and experience as per the structure shown below — view organisation chart ↓
Testing Facilities Physical / chemical / mechanical, DPT, UT / PAUT / RT MOU with: Inspection & Testing Engineers (Destructive Test Laboratory)
Address: F-22 & 23, Site C, Surajpur Industrial Area, UPSIDC, Greater Noida – 201 306 (UP)
Scope of MOU:
  • Chemical Analysis
  • Mechanical Testing
  • Microstructure & Macrostructure Analysis
  • Radiography Testing
  • Paint & Coating Testing
  • Ultrasonic Testing (UT) & Phased Array Ultrasonic Test (PAUT)
Mandatory Approvals MOU with NABL-approved lab:
Inspection & Testing Engineers (Destructive Test Laboratory)
Address: F-22 & 23, Site C, Surajpur Industrial Area, UPSIDC, Greater Noida – 201 306 (Uttar Pradesh)
Artisans Cutting, drilling, welding, blasting, metalizing, painting Welding Artisans
  • Qualification: ITI
  • Certified & trained through WRI
  • Experience: 5–10 years
Cutting, Drilling, Blasting, Metalizing & Painting Artisans
  • All artisans are well experienced and trained at the Works
Power Demand & Installed Supply Power demand: 450 KVA
Installed power supply: 450 KVA
Executed Works / Supplies Last 5 years, in tonnage 2021–2025:
  • Open Web Girder: 988.99 MT
  • Other Structures: 23,747.67 MT
Work in Hand In tonnage Other Structures: 7,000 MT
  • PES Engineers Private Limited Plot No. A-10, Phase-I, ESIPL, Sitarganj, Distt. Udham Singh Nagar (Uttarakhand)
    • Plant Head
      • Sr. Manager (Admin)  /  Manager (Accounts)
        • Asst. Manager (Stores)
          • Officer (Admin) + General Work
      • AGM (Production)  ×2
        • Manager (Production)
          • Dy. Manager (QA & QC)
            • Asst. Eng. (QA & QC)
              • Jr. Eng. (QA & QC)
          • Dy. Manager (Prod. & Material Mgmt) + ISO 9001:2015
            • Asst. Eng. (Prod.)
              • Jr. Eng. (Prod.)
                • Jr. Eng. (Painting)
          • EHS Sr. Officer
            • Safety Supervisor

Reference: Schedule of Technical Requirements (STR) for Fabrication of Steel Girders (Part-A & B) · Doc. No. BS-S-7.5.3.1-4 · Version 5.0 · Effective 06-07-2026 · ISO 9001:2015.